<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
<channel>
<title>Utility Jobs - latest</title>
<link>http://www.utilityjobsearch.com</link>
<description>3 most recently posted Flood jobs</description>
<language>en</language>
<pubDate>Thu, 28 Feb 2008 09:46:40 +0000</pubDate>
<lastBuildDate>Thu, 28 Feb 2008 09:46:40 +0000</lastBuildDate>
<copyright>Copyright: (C) Job Search Group</copyright>
<ttl>15</ttl>
<image>
<title>Utility Jobs - latest</title>
<url>http://www.utilityjobsearch.com/images/jobsearch_logo.gif</url><link>http://www.utilityjobsearch.com</link>
</image>
<item>
<title><![CDATA[Flood risk technical expert (All, U.K.)]]></title>
<link>http://www.utilityjobsearch.com/vacancy/Flood_jobs/Flood+risk+technical+expert/27192.html</link>
<guid>http://www.utilityjobsearch.com/vacancy/Flood_jobs/Flood+risk+technical+expert/27192.html</guid>
<description><![CDATA[Negotiable | Contract | Guildford | In accordance with paragraph 60 and appendix F of PPG 25 we have been advised to undertake a Flood Risk Assessment (FRA) of the development proposal for the site. 


&nbsp;


We must confirm as a minimum:


&nbsp;



    That it will be feasible to balance surface water run-off to the Greenfield run-off rate for all events up to the 1 in 100 year storm (including cli]]></description>
<pubDate>Thu, 28 Feb 2008 09:46:38 +0000</pubDate>
</item>
<item>
<title><![CDATA[Flood Risk Assessment Engineer (North West, U.K.)]]></title>
<link>http://www.utilityjobsearch.com/vacancy/Flood_jobs/Flood+Risk+Assessment+Engineer/26670.html</link>
<guid>http://www.utilityjobsearch.com/vacancy/Flood_jobs/Flood+Risk+Assessment+Engineer/26670.html</guid>
<description><![CDATA[Negotiable | Permanent | An engineer with expertise in flood risk analysis and drainage engineering. Relevant qualifications and experience are a requirement of the role with the ability to contribute to and/or manage design teams delivering a diverse range of highways and development infrastructure projects, which range from minor maintenance and improvement schemes to new highway and major devel]]></description>
<pubDate>Mon, 04 Feb 2008 00:00:00 +0000</pubDate>
</item>
<item>
<title><![CDATA[Flood Risk Engineer  (South East, U.K.)]]></title>
<link>http://www.utilityjobsearch.com/vacancy/Flood_jobs/Flood+Risk+Engineer/26663.html</link>
<guid>http://www.utilityjobsearch.com/vacancy/Flood_jobs/Flood+Risk+Engineer/26663.html</guid>
<description><![CDATA[Negotiable | Contract | To assist with continually increasing workload on PPS25 Flood Risk Assessments. The team's workload includes the following: FRAs ranging from to city centre regeneration schemes, assessing fluvial and coastal flood risk Design of strategic drainage systems focusing on SUDS Preparation of Environmental Statement chapters for the EIA team Pre-aquisition advice to developers o]]></description>
<pubDate>Mon, 04 Feb 2008 00:00:00 +0000</pubDate>
</item>
</channel>
</rss>
